Welcome Admin
Log Off

Why Choose Us

  • Expert Construction Services Since 1926.
  • Fully Integrated General & Civil Construction, Demolition, Recycling and Remediation Services.
  • Unique Knowledge of the Industries We Serve.
  • Fully Insured.
  • $40,000,000.00 Bonding Capacity. 

Let Us Help You With Your Project!

Recent News

News & Project Activities


Demolishing a housing project in the Naugatuck Valley.


Selective Demolition to support the architectural façade for redevelopment.


Using the high-reach to take down a commercial structure.Full Article

_____


Multiple underground tanks removed at a current site.

______



Full Article - Demolition of Mercer Coal


____

Letter of Award for the demolition of an abandoned Waste Water Treatment Facility in eastern Connecticut.

___


Stage 1 Complete on I-84 - Hamilton Ave. Bridge concrete deck and parapet removed.


© Copyright 2014 - Stamford Wrecking Company All Rights Reserved.

Mass Demolition - Windsor Dam

 

   



Demolition and site reconstruction of the existing 42 foot high by 105 foot long dam which held back the Windsor Reservoir.

The work was performed through the summer /winter months so maintenance of water flow and water diversion could be controlled during the phases of construction. Seismic and geotechnical engineering was critical for this project. This dam renovation impacted and the existing roadway bordered and was impacted by the jurisdictions of three towns.